08APR24 • West Africa Multiple Cables outages off Abidjan • Relief afoot 🎬 6️⃣ ❗ 📉 Despatch from our 2OCMA and ACMA Honourable Correspondents ! 😉 1️⃣ 🚢 CS Leon Thevenin completed SAT-3 cable repair as of 06APR24, now transiting to WACS CWG area defined by NTM NAVAREA II 094/24 to tentatively begin repair of WACS second of two faults on segment 3D. (plan of work subject to revision) 2️⃣ 🚢 CS Sovereign, fast transiting from Santa Cruz de Tenerife, about to reach her first assigned Cable Work Ground, where she will begin ops to repair ACE Seg 2.9 asap. Orange Marine Global Marine David Belson Doug Madory
How long in total ?